Have your say on road improvement works on Roehampton Lane

Closed 16 Mar 2015

Opened 16 Feb 2015

Results Updated 17 Jun 2015

We undertook a consultation on our proposals to improve congestion at the southern end of Roehampton Lane.

We have considered all of the feedback provided and can confirm that we plan to proceed with improving the existing layout of Roehampton Lane between Roehampton High Street and Clarence Lane on the northbound carriageway.  We will now commence with the detailed design stage of the scheme with a view to commencing the work to deliver the improvements in late Summer 2015.

Click here to review our consultation report for further information about the consultation which includes responses to the key issues raised.

Overview


Update on 8 June 2015

We undertook a consultation on our proposals to improve congestion at the southern end of Roehampton Lane.

We have considered all of the feedback provided and can confirm that we plan to proceed with improving the existing layout of Roehampton Lane between Roehampton High Street and Clarence Lane on the northbound carriageway.  We will now commence with the detailed design stage of the scheme with a view to commencing the work to deliver the improvements in late Summer 2015.

Click here to review our consultation report for further information about the consultation which includes responses to the key issues raised.
 

Details of the original consultation are included below:

----------------------------------------------------------------------------------------------------------------------

Background

Transport for London (TfL) is seeking your views on proposals to reduce congestion at the southern end of Roehampton Lane. As part of this work we are proposing to redesign the existing layout of Roehampton Lane between Roehampton High Street and Clarence Lane on the northbound carriageway

About the proposed changes

The proposed changes will improve congestion and include:

  • Widening the northbound carriageway to increase it from one to two lanes between Roehampton High Street and Clarence Lane. This will require the removal of 4 parking spaces on Roehampton Lane between Beech Road Close and South Thames College.
  • Lengthening the Roehampton Lane / Danebury Avenue bus stop to allow buses to stop safely at the kerbside. This will require the removal of 3 parking spaces.
  • Changes to operational hours of the parking bays between Kingsclere Close and Beech Close to improve traffic flow during the peak hours.
     

The additional lane would be created by realigning the existing carriageways with new road markings.

Please see the map below for further details:

 

 

Click here for a larger version of Roehampton Lane improvement works map (PDF)


Depending on the outcome of this consultation, we plan to introduce introduce these improvements during the summer of 2015 and would write to you nearer the time to inform you of the start and end dates for the work.
 

 

Areas

  • Wandsworth

Audiences

  • Public
  • Stakeholders
  • Local residents
  • Local businesses
  • Schools
  • London Boroughs
  • Coach Operators
  • Taxi trade
  • Transport for London
  • Taxi customers and other stakeholders

Interests

  • Roads